Main Menu

My Account
Online Free Samples
   Free sample   Project management assignment indigenous cultural awareness training program for central queensland university

Project Management Assignment: Indigenous Cultural Awareness Training Program For Central Queensland University

Question

Task: Professor May Norman, the Chair of the Indigenous Engagement at CQU has tasked you to provide the project board with further information regarding the project. The Chair will act as the Project Executive for the project board. You are to develop a tailored project plan that reflects the project described in this document and also aligns to PMBOK and Prince2 requirements.

Answer

1. Project Description
1.1 Project Background and Description

The detailed concept of this particular project is regarding the celebration of International Day in order to raise the responsiveness of Australian based Indigenous Culture within all most famous CQ University of Australia (International Institute for Sustainable Development (ISDG), 2020). In this strategic project plan, the two considered elements for raising the awareness of undertaken indigenous culture of Australia include the celebrating of diversity within the university and the engagement increase within the indigenous communities. However, in order to complete this project report, the 8 campuses of CQ University are selected based on different Australian based CQ University. This project is aimed to complete within 9th August, 2021 starting from 1st September 2020.
This project report elaborates the detailed plan of incurred cost baseline report, risks and associated tolerance undertaken in order to complete this International day for Indigenous people.

1.2 Justification
The main output mentioned in this Indigenous Culture CQ university project is to raise thetraining for improving the Cultural Awareness program, which exact outcome is to provide various cultural education to all CQ University associated staffs and students (CQUniversity Australia, 2020). However, the main benefits discussed in this project is to develop productive cultural understanding regarding Indigenous study within both staffs and students in CQU.

2. Stakeholders
2.1 Key Stakeholder List

 

Stakeholders

Category

Description of Interest

Description of Influence

1.

CQU University

User

The CQ University in this project look after of supplying all educational and training materials to all associated students and staffs depending on the educational standards.   (Derakhshan,Turner& Mancini, 2019).

Create strong influence, the responsible authority to implement a training program curriculum.

2.

AIATSIS

Supplier

This organization represent the complete indigenous communities for promoting the understanding and awareness of diversity in culture.

Create strong influence, provide the training materials to create strong program related benefit and outcome.

3.

Indigenous Community

Supplier

This community represent the associated cultural group for promoting the cultural awareness within staffs and students (Aragonés-Beltrán,García-Melón&Montesinos-Valera,2017).

Create Strong Influence

4.

Australians Together

Supplier

Supply assisting materials to create indigenous student program

Create Strong Influence

5.

PMC

Supplier

Support NADIOC activities to create proper contribution and achievements towards the society

Create Moderate Influence in generating project funds

6.

Cultural Competence Centre of Australia

Supplier

Provide required materials in order to develop program that assists in promoting cultural awareness of Australia (Di Maddaloni& Davis,2017).

Create Strong Influence

 

2.2 Stakeholder Engagement Assessment Matrix[ C = Current, D = Desired]

Stakeholders

Unaware

Resistant

Neutral

Supportive

Leading

CQ University

 

 

 

C

D

AIATSIS

 

 

C

D

 

Indigenous Community

 

 

C

D

 

Australians Together

 

 

D

 

 

PMC

 

 

C

D

 

Cultural Competence Centre of Australia

 

 

C

D

 

 

2.3 Stakeholder Communication

Communication Method

Push/Pull/Interactive

Justification

Push Communication Way- it includes letters, emails, project updates, reports etc.

 

 

 

 

 

 

 

 

 

PUSH

Based on this project criteria, the push communication technique is selected to maintain all stakeholders based on all different project locations (Fitri, Pratami&Tripiawan,2019, June). Moreover, this push communication technique is considered as more effective and efficient considering the interactive communication way.

This push communication method is chosen in case of doing non-urgent communication within all stakeholders.

Interactive Communication Way- this technique is implemented in case the push communication gets failed. It includes direct phone calls

 

2.4 Expert Judgement
In this Indigenous Cultural Awareness Training Program project started in the CQ University, two techniques are selected, which include the detailed opinion evaluations regarding cultural awareness within CQU students and the interviews and questionnaire techniques.

3. Requirement Management
In this Indigenous Cultural Awareness project, the “Acknowledge of Country” is considered asintroductory statement implemented by all associated stakeholders (Kermanshachiet al., 2019, January). However, in this project, the implemented statement used to welcome the country is generated by the traditional elder people associated owners’ group.

3.1 Requirement Gathering for Training Package
The way of implementing the training program for cultural awareness developed in Chinese local community is not the perfect way of developing program plan based on all different and unique considered cultures. In order to complete this project plan, multiple organizations are selected who mainly worked to develop training programs plan that mainly shows focus on the development of awareness regarding indigenous culture developed in CQ University. In order to develop successful collaboration with all considered organizations, a proper training project plan will be considered as better alternative rather than using of Chinese Cultural Awareness Program.

3.2 Requirement Prioritization Process
This particular process is mainly used to communicate within all associated stakeholders considering their different interests on project. However, this process causes the series of conflict within all stakeholders who helps to determine the project perfect closure (Edwards,Serra& Edwards, 2019). In order to limit the effect on project outcome, the technique of prioritisation matrix is implemented.

4. Scope
4.1 In-scope Statement

The in-scope statement considered in this international day project is to increase the engagement within the indigenous communication selected in CQ University of Australia.

4.2 Out-scope Statement
The out-scope statement of this project is to complete it within the 9th August, 2021 by selecting each different campus for celebrating the international day of Indigenous community.

5. Schedule
5.1 Work Breakdown Structure

Work-Breakdown-Structure

5.2 WBS Dictionary

Face to Face & Online Training Evaluations
WBS ID 1.1.1

Face to Face & Online Training Evaluations

WBS ID

1.1.1

Detailed work description

The assessment sheets are made thinking about all members; providers, understudies and staffs. This wbs id predominantly creates to give information dependent on preparing project and post impression regarding the developed cultural awareness of Indigenous plan.

Accurate Estimation of incurred cost

$2,500.00

Dates of Project start and finish

It completed within four weeks, considering the range of 12th November to 10th December, 2018.

 

Gap Analysis

WBS ID

1.1.2

Detailed work description

This particular wbs is mainly generated based on the identification of current gaps of cultural awareness considering the range of higher and lower education. It focused on the creation of training and program areas.

Accurate Estimation of incurred cost

$4,500.00

Dates of Project start and finish

It is completed within 6 weeks, 19th November to 14th January, 2019. In this duration, the considered business closure ranging from 23rd December to 2nd January, 2019. 

 

Developmentof customised Online Training Program

WBS ID

1.2.1

Detailed work description

This wbs is developed for comparing and selecting the suitable format of required software, online training and the required server details. The description of this wbs also include the selection of communication channels for the required training developed for the Indigenisation Committee.

Accurate Estimation of incurred cost

$11,000.00

Dates of Project start and finish

It is completed within the duration of 4 weeks, considering the time span of 8th January to 4th February, 2019.

 

Setting up of training program on college campus in 16 selected CQU Locations

WBS ID

1.2.2

Detailed work description

The details of this selected wbs is regarding the setting up of required face to face training platform at all 16 selected CQU location. It also includes the finding of suitable location to complete this cultural awareness training program.

Accurate Estimation of incurred cost

$6,400.00

Dates of Project start and finish

It will take 4 weeks to complete – 21st January to 18th February.

 

Generation of Indigenous study program materials list and training manual

WBS ID

1.3.1

Detailed work description

In this wbs, it mentioned about the creating of project expectations by doing proper communication with all suppliers. It also discussed about creating training materials. 

Accurate Estimation of incurred cost

$16,000.00

Dates of Project start and finish

It will take 7 weeks to complete – 4th March to 21st June, 2019

 

Providing the admittance of all training materials and manuals

WBS ID

1.3.2

Detailed work description

In this wbs id, it mainly discussed regarding the selection of communication method used for collaborating the manual and training plan creation. It discussed about the prevention of gap that occurs in engaging the cloud environment.

Accurate Estimation of incurred cost

$6,000.00

Dates of Project start and finish

It will take 3 weeks to complete – 4th Feb to 25th February, 2019

 

Gap Analysis

WBS ID 1.1.2
Detailed work description This particular wbs is mainly generated based on the identification of current gaps of cultural awareness considering the range of higher and lower education. It focused on the creation of training and program areas.

Task Name

Duration

Start

Finish

Detailed analysis of similar program plan developed based on response expectations and questions baseline

12/11/2018

21/11/2018

8 Days

Development of both considered online and face to face participants evaluation questions

22/11/2018

07/12/2018

12 Days

Creation of online based evaluation questions form for both considered face to face and online participants

03/12/2018

10/12/2018

6 Days

Analysis regarding current cultural Understanding of all university’s staffs and students

19/11/2018

04/12/2018

12 Days

Identification of ideal future state through proper stakeholder communication

05/12/2018

19/12/2018

11 Days

Identification of current and ideal state differences and devising of appropriate improvement plan

20/12/2018

14/01/2019

10 days (except public Holidays)

Detailed research and selection of online training software utilised for doing cultural awareness

08/01/2019

04/02/2019

20 days

Identification of appropriate locations to held all the 16 CQU locations

21/01/2019

18/02/2019

21 days

Identification of indigenisation committee and suppliers’ expectations

04/03/2019

20/03/2019

13 Days

Creation of all training modules and manuals to complete both the training programs

21/03/2019

17/04/2019

20 Days

Printing of coaching manuals and materials for all participants

19/06/2019

21/06/2019

2 Days

Selection of communication methods used for assisting the collaboration within training program and suppliers

04/02/2019

20/02/2019

13 days

Providing the complete access to all project stakeholders, managers and suppliers

21/02/2019

25/02/2019

3 Days

 

Developmentof customised Online Training Program
WBS ID 1.2.1

Developmentof customised Online Training Program

WBS ID

1.2.1

Detailed work description

This wbs is developed for comparing and selecting the suitable format of required software, online training and the required server details. The description of this wbs also include the selection of communication channels for the required training developed for the Indigenisation Committee.

Accurate Estimation of incurred cost

$11,000.00

Dates of Project start and finish

It is completed within the duration of 4 weeks, considering the time span of 8th January to 4th February, 2019.

 

Setting up of training program on college campus in 16 selected CQU Locations
WBS ID 1.2.2

Setting up of training program on college campus in 16 selected CQU Locations

WBS ID

1.2.2

Detailed work description

The details of this selected wbs is regarding the setting up of required face to face training platform at all 16 selected CQU location. It also includes the finding of suitable location to complete this cultural awareness training program.

Accurate Estimation of incurred cost

$6,400.00

Dates of Project start and finish

It will take 4 weeks to complete – 21st January to 18th February.

 

Generation of Indigenous study program materials list and training manual
WBS ID 1.3.1

Generation of Indigenous study program materials list and training manual

WBS ID

1.3.1

Detailed work description

In this wbs, it mentioned about the creating of project expectations by doing proper communication with all suppliers. It also discussed about creating training materials. 

Accurate Estimation of incurred cost

$16,000.00

Dates of Project start and finish

It will take 7 weeks to complete – 4th March to 21st June, 2019

 

Providing the admittance of all training materials and manuals
WBS ID 1.3.2

Providing the admittance of all training materials and manuals

WBS ID

1.3.2

Detailed work description

In this wbs id, it mainly discussed regarding the selection of communication method used for collaborating the manual and training plan creation. It discussed about the prevention of gap that occurs in engaging the cloud environment.

Accurate Estimation of incurred cost

$6,000.00

Dates of Project start and finish

It will take 3 weeks to complete – 4th Feb to 25th February, 2019

Dates of Project start and finish It will take 3 weeks to complete – 4th Feb to 25th February, 2019

5.3 Schedule

Task Name

Duration

Start

Finish

Detailed analysis of similar program plan developed based on response expectations and questions baseline

12/11/2018

21/11/2018

8 Days

Development of both considered online and face to face participants evaluation questions

22/11/2018

07/12/2018

12 Days

Creation of online based evaluation questions form for both considered face to face and online participants

03/12/2018

10/12/2018

6 Days

Analysis regarding current cultural Understanding of all university’s staffs and students

19/11/2018

04/12/2018

12 Days

Identification of ideal future state through proper stakeholder communication

05/12/2018

19/12/2018

11 Days

Identification of current and ideal state differences and devising of appropriate improvement plan

20/12/2018

14/01/2019

10 days (except public Holidays)

Detailed research and selection of online training software utilised for doing cultural awareness

08/01/2019

04/02/2019

20 days

Identification of appropriate locations to held all the 16 CQU locations

21/01/2019

18/02/2019

21 days

Identification of indigenisation committee and suppliers’ expectations

04/03/2019

20/03/2019

13 Days

Creation of all training modules and manuals to complete both the training programs

21/03/2019

17/04/2019

20 Days

Printing of coaching manuals and materials for all participants

19/06/2019

21/06/2019

2 Days

Selection of communication methods used for assisting the collaboration within training program and suppliers

04/02/2019

20/02/2019

13 days

Providing the complete access to all project stakeholders, managers and suppliers

21/02/2019

25/02/2019

3 Days

 

6. Cost Baseline
1.1.1Training Evaluations – Face to Face & Online

Activity Name

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

June

Analysis

 

 

400

 

 

 

 

 

 

 

Setting of different evaluation questions

 

 

750

750

 

 

 

 

 

 

Creation of the evaluation access

 

 

 

600

 

 

 

 

 

 

 

 

 

1150

2500

 

 

 

 

 

 

 

1.1.2 Gap Assessment

Activity Name

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

June

Analysis

 

 

1100

300

 

 

 

 

 

 

Identification

 

 

 

1400

 

 

 

 

 

 

Devising of project plan

 

 

 

800

900

 

 

 

 

 

 

 

 

1100

3600

4500

 

 

 

 

 

 

1.2.1Customisation of Online Training Program

Activity Name

Sept

Oct

Nov

Dec

Jan

Feb

Mar

April

May

June

Creation of research format

 

 

 

 

900

 

 

 

 

 

Selecting of purchase software/format

 

 

 

 

6000

3000

 

 

 

 

Accurate customization

 

 

 

 

 

1100

 

 

 

 

 

 

 

 

 

6900

11000

 

 

 

 

 

1.2.2 Setting up of on campus training plan program in 16 selected CQU Locations

Activity Name

Sept

Oct

Nov

Dec

Jan

Feb

Mar

April

May

June

Location Identifications

 

 

 

 

300

 

 

 

 

 

Comparing of selected locations

 

 

 

 

 

300

 

 

 

 

Final booking

 

 

 

 

 

5800

 

 

 

 

 

 

 

 

 

300

6400

 

 

 

 

 

1.3.1 Creation of materials list and training manual

Activity Name

Sept

Oct

Nov

Dec

Jan

Feb

Mar

April

May

June

Identification of training needs

 

 

 

 

 

 

1000

 

 

 

Creation of training module

 

 

 

 

 

 

6000

5000

 

 

Printing of final training module

 

 

 

 

 

 

 

 

 

4000

 

 

 

 

 

 

 

7000

5000

 

4000

 

1.3.2 Providing the access of all training materials and manuals

Activity Name

Sept

Oct

Nov

Dec

Jan

Feb

Mar

April

May

June

Identification of training needs

 

 

 

 

 

 

1000

 

 

 

Creation of training module

 

 

 

 

 

 

6000

5000

 

 

Printing of final training module

 

 

 

 

 

 

 

 

 

4000

 

 

 

 

 

 

 

7000

5000

 

4000

 

7. Risks

Risk Description

Likelihood

Impact

Response Criteria

Mitigation plan

1. The main risk is environmental risk that mainly caused because of university access issues for all training providers in order to have complete university access.

Probable

High chance

Emergency

In order to mitigate this risk, all the training classes shifted from university locations to online platform giving all participants the recorded or live view.

2. This risk discussed about the connection failure and program down occurred in international day celebration of Indigenous community

High Probability

High chance

Emergency

To mitigate this risk, it is required to purchase 24/7 online training software that helps to mitigate all faced project concerns.

3. This risk discussed regarding the Indigenous Committee people capability that assists in completing this International Day project within the predetermined time frame.

Probable

High Chance

Less impact

To ease this risk, it is required to develop timely schedule plan of completing the project within 13 weeks of time.

4. This risk is discussed regarding of not sharing project detailed information to the community.

Probable

Moderate

Less impact

To mitigate this risk, it is required to develop media advertisement program with the help of implementing multiple associated stakeholders.

All associated project stakeholders pay visit during the NAODIC week, in order to create learning opportunities

Likely

High Moderate

Exploit

The value of dependant varies based on the characteristics of traditional owners following the attitudes, locations and beliefs.

 

All associated project stakeholders pay visit during the NAODIC week, in order to create learning opportunities Likely High Moderate Exploit The value of dependant varies based on the characteristics of traditional owners following the attitudes, locations and beliefs.

8. Tolerances

Tolerance

Specific Allowed Tolerance

Tolerance based on time factor

Completing the project within 13 weeks

Tolerance based on cost factor

Completing the project within the budget of $4,640.00

 

9. Lessons Learnt

Previous Learned Lesson

Proposed action plan

Lesson 1: Based on the above project plan, the first considered lesson is regarding the off-the-shelf online training module that get failed because of not having proper learning system interface.

To stop this in reoccurrence, the detailed research of various online training module or software need to be irrespective with the characteristics of CQU Moodle interface design.

Lesson 2: This lesson is regarding the implementation of cross-cultural training package selection that occurred within all selected indigenous groups based on all 16 CQU locations.

The developed program will be use multiple supplier plan that collaborated and customised based on the information of surrounding areas.

 

References
Aragonés-Beltrán, P., García-Melón, M., &Montesinos-Valera, J. (2017). How to assess stakeholders' influence in project management? A proposal based on the Analytic Network Process. International journal of project management, 35(3), 451-462.
CQUniversity Australia (2020), Locations.Retrieved 28 February 2020 from https://www.cqu.edu.au/about-us/locations Derakhshan, R., Turner, R., & Mancini, M. (2019). Project governance and stakeholders: a literature review. International Journal of Project Management, 37(1), 98-116.
Di Maddaloni, F., & Davis, K. (2017). The influence of local community stakeholders in megaprojects: Rethinking their inclusiveness to improve project performance. International journal of project management, 35(8), 1537-1556.
Edwards, P. J., Serra, P. V., & Edwards, M. (2019). Managing Project Risks.John Wiley & Sons.
Fitri, N., Pratami, D., &Tripiawan, W. (2019, June).Project Baseline Design for Scope, Time, and Cost Aspect in PutriProvinsi Multi Set Toys Book Project PT XYZ Bandung.In 5th Bandung Creative Movement International Conference on Creative Industries 2018 (5th BCM 2018).Atlantis Press.
International Institute for Sustainable Development (ISDG) (2020), International Day of the World’s Indigenous Peoples 2020. Retrieved 28 February 2020 from https://sdg.iisd.org/events/international-day-of-the-worlds-indigenous-peoples-2020/
Kermanshachi, S., Safapour, E., Anderson, S., Molenaar, K., &Schexnayder, C. (2019, January). Development of the Cost Baseline for Achieving Excellence in Rural Transit Facilities.In Transportation Research Board 98th Annual Meeting.
Kritsky, D. N., Druzhinin, E. A., Pogudina, O. K., &Kritskaya, O. S. (2018, September). Decision making by the analysis of project risks based on the FMEA method. In 2018 IEEE 13th International Scientific and Technical Conference on Computer Sciences and Information Technologies (CSIT) (Vol. 2, pp. 187-190).IEEE.
Liu, S., Xia, F., Zhang, J., Pan, W., & Zhang, Y. (2016). Exploring the trends, characteristic antecedents, and performance consequences of crowdsourcing project risks. International Journal of Project Management, 34(8), 1625-1637.

NEXT SAMPLE

Related Samples

Question Bank

Looking for Your Assignment?

Search Assignment
Plagiarism free Assignment

FREE PARAPHRASING TOOL

PARAPHRASING TOOL
FREE PLAGIARISM CHECKER

FREE PLAGIARISM CHECKER

PLAGIARISM CHECKER
FREE PLAGIARISM CHECKER

FREE ESSAY TYPER TOOL

ESSAY TYPER
FREE WORD COUNT AND PAGE CALCULATOR

FREE WORD COUNT AND PAGE CALCULATOR

WORD PAGE COUNTER



AU ADDRESS
9/1 Pacific Highway, North Sydney, NSW, 2060
US ADDRESS
1 Vista Montana, San Jose, CA, 95134
ESCALATION EMAIL
support@totalassignment
help.com